State of Oklahoma Watershed and Water Permitting Management

Lynker developed and calibrated CRAM models for the Red, Verdigris, Muddy Boggy, Blue, and North Canadian River Basins from 2010 to 2015. Since then we have worked with OWRB and the U.S. Bureau of Reclamation (USBR) to update model operations to conform to USBR management of individual reservoirs within the basins. The modeling work for the river basins includes flow naturalization for the basin, simulation of pipeline transfers, reservoir operations, evaporative losses, and groundwater pumping. Lynker staff also worked on Oklahoma’s Comprehensive Water Plan, which provided a detailed analysis of water supply and demand throughout the state by watershed projected to 2060. Our work on the Comprehensive Plan included a climate change analysis, calculating adjustment factors for flow and consumptive irrigation requirement (or irrigation demand) for 2030 and 2060, which were then used to adjust natural flow and historical evaporation.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.